Tag: gallery

  • Dry Stone Walling

    Dry Stone Walling

    The last time we were dry stone walling was when we rebuilt the old stone wall in front of the house – the future School.

    At the end of the summer of 2022, we were moving to the left corner:

    What certainly helped was that at the previous radna akcija (“work action”), when ISSA hosted a group from the Green Academy, the hard preparatory work of digging and sorting the stones happened.

    Check out the gallery and see for yourselves: